Searching for Improved Accuracy in Gas Flow Measurements?

The hoping to further develop exactness and simplicity of activity, in a generally difficult gas measurement application.

In Canada the execution of Enhanced Production Audit Program (EPAP) will expand the requirement for more exact flow measurement information.

Specialized Challenge

Energy makers are continually checking out ways of further developing their standard natural gas measurement focuses inside their activities. One basic region that requires steady and dependable measurement is fuel gas meters regularly situated at blower destinations. On bigger blowers or locales with numerous blowers where day by day normal utilization surpasses 0.5 em/day ERCB Directive 17 specifies that a super durable measurement gadget should be introduced for all fuel gas utilization.

A Case study: 2 huge energy makers with part of their tasks in Northwestern Alberta and Northeastern B.C low flow meter. were confronted with finding and normalizing on an answer that would address the difficulties presented by estimating fuel gas precisely and reliably in a dependable and financial bundle that would likewise meet Directive 17 consistence. The significance is being highlighted with the full scale execution of EPAP (Enhanced Production Audit Program) in 2011 industry wide.

Customary method for estimating fuel gas missed the mark regarding their objectives in satisfying this guideline. Hole plates did not have the turndown range needed to quantify both the ostensible fuel gas utilization and the beginning gas when a blower is enacted. The organizations favored a gadget that could deal with the two measurements consistently. Moreover, the lower flow goes ordinarily found on a fuel gas line represented an issue because of a hole plate's high strain drop and exactness was compromised thus.

While a standard tension and temperature coefficient can be applied to finish the flow measurement rate, this presented a manual interaction by which the administrators/directors needed to stick to for fulfillment of their computations. Likewise, PD meters were defenseless to harm due to over running when a blower was begun bringing about exorbitant upkeep and vacation. An answer was required.

The Flowstar Solution

The two organizations found their answer in a gas measurement framework comprising of a high exactness, strong gas turbine working together with an electronic flow PC (EFM).

The gas turbine gives amazing exactness profiles (+/ - 2%) in a 316 treated steel built body and inward parts that use fired, self greasing up, low drag course. A 40:1 turndown proportion guarantees that both the ostensible fuel gas and the blower start gas are precisely estimated. As fuel gas lines are commonly more modest in plan (1") the low flows seen are effectively estimated by a 1" turbine. Adaptability is incorporated into the turbines as the rotor pitch can be changed to as low as 45 degrees to catch even lower flows at comparable tensions. The standard pitch is 15 degrees.

The Hawk 9500 EFM conveys remarkable functional execution with an appraised precision of +/ - 0.05% full scale on pressure and +/ - 0.5% C on temperature. The Hawk 9500 performs completely repaid flow rate estimations to AGA7 (rotational turbines) and AGA8-92 (gas compressibility) principles. It is likewise API Chapter 21 review trail consistent. With its Class I Div I IS appraising and IS lithium particle battery pack, region groupings are not an issue and proposition the end client simplicity of establishment and more modest impression. A correspondence board can be initiated to help RS 485 Modbus interchanges to a SCADA host or PLC.

Results

Both energy organizations have carried out the Flowstar gas measurement arrangement on various blowers with phenomenal outcomes to date. With this plan it limited administrator association and interferences and furthermore gave them a 1 stop administration point for any future specialized changes or investigating. While creating a moving diagram of chronicled information on one specific 1" line it delivered a flow pace of 0.5 em/day at 110 psi. The pinnacle volume on blower fire up, nonetheless, came to as high as 14 em/day, addressing a turndown proportion of 28:1, well inside the reach.